Porch, insulation, trim, chimney etc.
Thursday, August 30th, 2007Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/dolphind/www/house/wordpress/wp-includes/formatting.php on line 74
It has been a busy few days with no free time to write posts.
The insulation arrived for the walls of the house.
There have been a few cold nights and autumn is definitely in the air, although it is hot and sunny today.
My passion flower vine is loving it here.
At night the loons and barred owls can be heard. In the evening the pileated woodpeckers make a terrific noise. It is wonderful to see them right by the house.
The masons have finished with the chimney, just the inside needs to be finished off. They gave me some lessons and I was able to build the brick pad for the wood stove to stand on.
Work has been progressing on the trim.
And the porch
Insulation is being installed on the south side of the house.
And the overhang on the south side is being finished off.