Pouring the Slab
Today is the big day. Clear, sunny, cool and breezy. Perfect weather for pouring the slab. Joey Thornley, Jr turned up early and pouring began as soon as the cement truck arrived. It took two truck loads to complete the job. It was a bit of a tight fit for the big trucks, but they made it.
August 14th, 2007 at 1:01 pm
So whats sticking out of the slab? I assume that the red stuff is the heating pipes? But what about all those other pipes? just trunking for water / mains etc?
In the last picture are they steel rods sticking out?
August 15th, 2007 at 8:38 am
The white pipes are the underground plumbing for drains. The steel rods are a guide for leveling the slab.