Starting the chimney and porch
Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/dolphind/www/house/wordpress/wp-includes/formatting.php on line 74
Yesterday the overhang was framed in and plywood installed to hold the metal roofing.
And the frame for the screen porch was started.
John Billings and his assistant Elmo started work on the chimney.
We are still hoping that the Trues Pond dam will be repaired this fall. In the meantime the canada geese are gathering.